Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 6

Show all pages
Page 6

Page 6 1 you would like I can provide a brief opening statement 2 or if you want to just go and start with John Futey 3 it's up to you. 4 CHAIRMAN NEUER: It's your case. If you 5 would like to make a brief opening statement I'll 6 certainly honor that request. 7 MS. PARLAVECCHIO: Sure. I'll just be 8 really brief just to refresh everyone's memory and for 9 those who were not at the last meeting. So we were 10 last here on September 12th. As you have noted we had 11 finished direct examination of Mr. John Futey, and 12 today we will obviously hope to finish that. 13 We had presented our civil engineer, 14 Michael Blake, who had provided testimony about the 15 site plan, as well as the existing and proposed 16 conditions on the site. In addition to that he 17 provided some detail about the stormwater management 18 upgrades that are being proposed on the site due to 19 NJDEP requirements as well as green infrastructure 20 regulations. 21 Our next witness at our last meeting was 22 John Copa who discussed the electrical engineering 23 aspects of the 26kV replacement, the lighting proposed 24 on the site, as well as the additional lightning mass 25 that we will be providing. And Mr. Copa discussed the

File revisions (1)