Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 61

Show all pages
Page 61

Page 61 1 doubt, but I can't really speak to the engineering 2 behind it and how that all lays out and what will be 3 involved in that. 4 CHAIRMAN NEUER: Anything else, Ms. 5 Malanga? 6 MS. MALANGA: No, just my request stands if 7 he would consider revisiting. Thank you. 8 CHAIRMAN NEUER: Mr. Fagan, hands up? 9 MR. FAGAN: Yes, Mr. Chairperson. Joyce 10 Rudin, welcome to the meeting. Please state your name 11 and address for the record. 12 MS. RUDIN: Hi. Good evening. This is 13 Joyce Rudin, 38 Woodland Avenue. Mr. Futey, you have 14 repeatedly stated that you are in compliance with our 15 township's tree ordinance and that you're meeting all 16 of the requirements. Are you familiar with point 17 number six in the prohibitions which does not allow 18 work to be done -- I will read it specifically, 19 "perform street, curb, and sidewalk construction or 20 repairs unless utilizing methods that protect the roots 21 and trunk of a tree, such as manual excavation, 22 reducing the curb, curbing sidewalks surrounding tree, 23 and modifying driveway aprons to accommodate trees. 24 Are you familiar with that clause? 25 THE WITNESS: Yeah. I've read the

File revisions (1)