Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 17, 2024

9 19 24 West Orange BOA ZB 24 06 PSEG Full size

Preserved file SHA-2569433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187f

Indexed text · page 74

Show all pages
Page 74

Page 74 1 simply discuss the specific variance relief that's 2 being sought from this Board? 3 CHAIRMAN NEUER: To have a complete record 4 we need to go through the waivers. 5 MS. PORTER: That's fine. 6 THE WITNESS: The submission items. The 7 first is that we have signature blocks for Board 8 members and professionals. That is on our site plan. 9 However, I admit it's confusing because we have the 10 survey before the site plan, but the site plan does 11 have the signature blocks. That is item number eight. 12 Item number 20, the request was that all 13 property information be on the survey. It is. Also, I 14 included the Deed from the property from 1928. 15 Item number 24, we were asked what are the 16 required permits for this application. 17 CHAIRMAN NEUER: I'm sorry. You mean 18 number 23. 19 THE WITNESS: Yes. Excuse me. The other 20 permits I need, NJDEP, water, Bureau of Water 21 Allocation. That is for construction dewatering. A 22 second permit would be NJDOT Minor Access Permit. That 23 is because as Mike Blake explained we will be 24 reconfiguring our entrance onto Mount Pleasant Avenue. 25 You all know that's state Highway 10, therefore I must

File revisions (1)