Supporting Documentation · Oct 17, 2024
9 19 24 West Orange BOA ZB 24 06 PSEG Full size
9433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187fIndexed text · page 80
Show all pagesPage 80 1 that we have been before this Board many times. And 2 every time it is for expansion of a nonconforming use, 3 the public utility. Also, for a structure taller than 4 35 feet. And we've often come before this Board for 5 fence height variances and setback requirements. 6 I should mention that in terms of height we 7 do have 14 existing 70-foot high lightning mast. We 8 have an H frame. It's shaped like an H, hence why we 9 call it an H frame. And that's 73.5 feet. And we have 10 a radio microwave tower that is 188 feet. That was 11 installed to support our 862 megahertz system which is 12 what we used to contact our crews via radio. I 13 personally was part of that application and was as a 14 young planner without a license at the hearing for that 15 in 1992. 16 So now I'll go through some of the bulk 17 variances -- 18 CHAIRMAN NEUER: Oh, you have to stand up 19 again because you're frozen. Maybe I won't pay my 20 PSE&G bill this month. I'll get their attention. I 21 think it was only 120 last month. 22 MR. PORTER: Noreen, you are frozen again, 23 until just now. 24 THE WITNESS: I know. I have to keep 25 plugging in the connection.
File revisions (1)
- Sep 29, 2026
9433fd033100683,324 bytes