Supporting Documentation · Oct 17, 2024
9 19 24 West Orange BOA ZB 24 06 PSEG Full size
9433fd033100a06a48d010c7af144f55155da8cf8750a05d678b8aed190f187fIndexed text · page 85
Show all pagesPage 85 1 site. One non-conformity could be the distance between 2 buildings. Please note that the buildings are placed 3 for electric functionality. This is obviously not a 4 commercial shopping mall or anything where you have 5 buildings placed next to each other for different 6 needs. The buildings here are often closer together 7 for electric needs. 8 So that concludes the five variances that 9 we're looking for. Now I'd like to -- 10 CHAIRMAN NEUER: Ms. Porter, it's going to 11 be very difficult for a Board to grant a variance that 12 says plus everything else that's wrong with the site. 13 MR. PORTER: Correct. So -- 14 CHAIRMAN NEUER: We really do need a list 15 of what Ms. Merainer is talking about. 16 MR. PORTER: Yes. So these are 17 pre-existing non-conformities. So we're essentially 18 seeking a continuation, but to the extent that the 19 Board would like a specific list of what those are they 20 are identified on the plan but we can certainly provide 21 that. 22 CHAIRMAN NEUER: That would be very 23 helpful. Thank you. 24 THE WITNESS: Just to reiterate, I believe 25 the only one would be the distance between buildings.
File revisions (1)
- Sep 29, 2026
9433fd033100683,324 bytes