Supporting Documentation · Oct 10, 2024
23 1345 006 ZB 24 11 481 Eagle Rock Ave Engineering Review
e8858a03979e978da0a0ea31b4c8a11b5aeff9f199d4b602ce3128da54e7ea4aIndexed text · page 1
Show all pagesMatrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 F: 973.240.1818 www.mnwe.com October 4, 2024 Via E-mail (JVite@westorange.org) Zoning Board of Adjustment Township of West Orange 66 Main Street West Orange, New Jersey 07052 Attn.: Jamilet Baquerizo Vite – Board Secretary RE: ENGINEERING REVIEW FOR WONDER GROUP, INC. WEST ORANGE PLANNING BOARD APPLICATION No. ZB 24-11 481 EAGLE ROCK AVENUE (BLOCK 152.01, LOT 1445.01) TOWNSHIP OF WEST ORANGE, ESSEX COUNTY, NEW JERSEY MATRIX No. 23-1345-006 Ms. Vite, As requested, Matrix New World Engineering, Land Surveying and Landscape Architecture, PC (Matrix) has reviewed the Zoning Board application and supporting documentation for the above- referenced site. Matrix has prepared a technical engineering review of the proposed improvements at the subject site. It shall be noted that our review of the project is limited to site/civil engineering only. Matrix defers all planning matters, including but not limited to, bulk and/or use variances, conformance with the master plan and ordinances, etc. As provided by your office, Matrix has received and reviewed the following documents for this project: • Township of West Orange Application form for the Planning Board or Zoning Board of Adjustment, dated August 29, 2024 • As-built Survey of Block 1445.01, Lot 152.01 prepared by James D. Sens for Control Point Associates, Inc., dated January 5, 2024 • Property buffer report (200-foot owner list) for Block 1445.01, Lot 152.01, prepared by the Office of the Tax Assessor, Township of West Orange, dated December 29, 2023 • Verification of Taxes and Sewer Charges Paid, Block 1445.01, Lot 152.01, Mayfair Farms Holding Corp, prepared by the Office of the Tax Collector, dated December 27, 2023 • Aerial imagery of the project site, dated August 7, 2024 • Preliminary and Final Major Site Plan, prepared by Bohler Engineering NJ, LLC., dated January 3, 2024 • Variance Justification Memo prepared by Stonefield Engineering & Design, LLC, dated September 10, 2024
File revisions (1)
- Sep 29, 2026
e8858a03979e192,674 bytes