Supporting Documentation · Oct 10, 2024
23 1345 006 ZB 24 11 481 Eagle Rock Ave Engineering Review
e8858a03979e978da0a0ea31b4c8a11b5aeff9f199d4b602ce3128da54e7ea4aIndexed text · page 3
Show all pagesMatrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 F: 973.240.1818 www.mnwe.com 3.2 Specification sheets have been reviewed for the carport canopy and walk-in refrigeration units, however these were not included in the Construction Details plan sheet. Details of both shall be added to the Construction Details plan sheet. 4. Grading and Drainage 4.1 As part of the drainage design, the Applicant is proposing trench drains along the perimeter of the new concrete pad. Applicant shall clarify the details of the drainage system between the proposed concrete pads, including direction of flow, connection to other drainage, and discharge. Roof drain connection to perforated pipe and discharge to riprap end shall be included as details in the Construction Details plan sheet. 4.2 The site plans show no proposed drainage of the concrete sidewalk and walk-in coolers to be installed in the southwest portion of the project site. Applicant shall confirm that no drainage is needed at this area of the site. 5. Soil Erosion and Sediment Control 5.1 The Applicant shall obtain a permit from the Hudson-Essex-Passaic Soil Conservation District as it appears there will be more than 5,000 square feet of soil disturbance as a result of this project (+/- 8,082 SF). The permit shall be in possession and remain on site prior to commencement of any work on the site. 6. Site Lighting 6.1 The applicant shall provide testimony as to whether the facility will be operating after dusk, and whether necessary lighting will be installed. 6.2 If yes, The Applicant shall provide testimony regarding the existing site’s compliance with Township Ordinance §25-14, related to lighting levels. 7. Landscaping 7.1 The Applicant shall provide testimony regarding existing vegetation, and any related removals, replacements, or new planting areas (as none are currently shown). 8. Utilities 8.1 The Applicant shall confirm if new utility service lines, laterals, connections, or associated appurtenances are needed for the proposed improvements.
File revisions (1)
- Sep 29, 2026
e8858a03979e192,674 bytes