Supporting Documentation · Oct 10, 2024
M_ZB 691 Eagle Rock Ave Engineering Forestry 3
ebc93cde32c974ff6ef88558897484ea44b9aa02b5de2e4fd90d8ec59db3cdc2Indexed text · page 5
Show all pages4.17. It is assumed the Applicant/Owner will own and be responsible for on-site water and sewer improvements. This should be confirmed. Vv. PERMITS 4.1. Should the Board approve this application: 4.1.1. Certification from the Hudson-Essex-Passaic Soil Conservation District will be required if more than 500 sf of disturbance will occur. 4.1.2. Soil removal permit will be required if more than 300 CY of soil will need to be moved. 4.1.3. A street opening permit for work within the ROW will need to obtain from County. 4.1.4. A sewer permit and fee application will need to be obtain from Engineering Department. 4.1.5. A tree removal application and permit will be required from the Township Forester. 4.1.6. We recommend an “As-Built Topographic Plan” be submitted prior to the issuance of a certificate of occupancy. Please contact us should you have any questions. AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org
File revisions (1)
- Sep 29, 2026
ebc93cde32c91,705,667 bytes