Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 30, 2024

Tree Report Complete File Updated 101524

Preserved file SHA-25680a4a7084a9a577c8fa822c70c10e6f4e33c9b6b3536edabdd45ac52be775b0e

Indexed text · page 33

Show all pages
Page 33

Brace Assemblies Locating Braces Assemblies at Corners, Ends, Gate Posts, and Mid-Line (Line) Length of Straight Run of Fence between Corner, End, Gate Posts, and/or Line Brace Type of Brace Assembly needed at Corner, End, and/or Gate posts Line Brace Assemblies: Whether they are required, and if so, at what Intervals in a straight run of fence Less than 700 feet Single-Span Brace Line braces are not required at fixed intervals for this run of fence. Use line braces as needed at top and bottom of hills. 700 to 1,300 feet Double-Span Brace Line braces are not required at fixed intervals for this run of fence. Use line braces as needed at top and bottom of hills. More than 1,300 feet Depends on the spacing of line braces used in the run of fence: Line braces are required: Use a single-span brace if the distance to the line brace is less than 700 feet. Use at least one line brace (double -span) every 1,300 feet in the run of fence, and as needed on the tops and bottoms of hills. Use a double-span brace if the distance to the line brace is 700 to 1,300 feet. Note: A run is the distance between a corner, end, gate, or brace post and the next corner, end, gate, or brace post. Brace Assembly Length Single-span brace assemblies shall be a minimum of 10 feet long. Double-span brace assemblies shall be a minimum of 16 feet long. 5

File revisions (1)