Supporting Documentation · Oct 30, 2024
Tree Report Complete File Updated 101524
80a4a7084a9a577c8fa822c70c10e6f4e33c9b6b3536edabdd45ac52be775b0eIndexed text · page 34
Show all pagesBrace Assembly Placement in Line Line brace assemblies shall be installed at appropriate intervals in a run of fence and at all sharp breaks in grade, typically when the change in slope is greater than 15%. or less or greater Runs up to 1,300 feet: Use Line braces as needed at tops and bottoms of hills Fence run greater than 1,300 feet between braces: Use Double-Span Line Brace every 1,300 feet and as need. Brace Assembly Placement at Corners, Ends, and Gates Single-span or double-span brace assemblies are required at all corners, ends, and gates, and where the fence alignment changes direction by more than 40 degrees. If a wide stream or gully is to be crossed, the fence section shall be terminated on one bank with a brace assembly, and a new section with a brace assembly shall be started on the other bank. Fence length less than 700 feet: Use single-span brace assemblies at corners, ends, and gate posts. Fence length 700-1,300 feet between braces: Use double-span brace assemblies at corner, end, and gate posts. Diagram courtesy of NRCS 6
File revisions (1)
- Sep 29, 2026
80a4a7084a9a9,693,967 bytes