Supporting Documentation · Oct 30, 2024
Tree Report Complete File Updated 101524
80a4a7084a9a577c8fa822c70c10e6f4e33c9b6b3536edabdd45ac52be775b0eIndexed text · page 41
Show all pagesDeer Fence Installation Training Video To be eligible for NJDA Matching Grants for Deer Fencing on Unpreserved Farms, applicants must watch the SADC Deer Fence Installation Training Video . The video is available here: https://youtu.be/Oko0ObsIHSg. You are only required to watch the fence installation portion of the video, which begins at 1:02:26 and concludes at 1:27:36. Source Notes The specifications in this Appendix are derived from the following sources: High-tensile Woven Wire Fences for Reducing Wildlife Damage FS889 Rutgers University, March 2010. Deer Fence Bid Specifications NJ Department of Agriculture, Division of Agriculture and Natural Resources, November 2004. Fence Technical Reference (382) NJ-NRCS, November 2014. NJ Deer Exclusion Fence Installation and Removal Guidance for (382) Fence NJ-NRCS October 2015. SADC Farmland Stewardship Deer Fencing Program Training on Proper Installation and Maintenance, July 2017. https://youtu.be/Oko0ObsIHSg. Where discrepancies exist between these sources and this Appendix, the standards set forth in this Appendix shall apply. * The training video was produced by the SADC, but the NJDA requires the same specifications for deer fences constructed pursuant to this Program. 13
File revisions (1)
- Sep 29, 2026
80a4a7084a9a9,693,967 bytes