Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 6, 2024

23 1345 004 PB24 15 31 35 Harrison Avenue Engineering Review

Preserved file SHA-25617a524da738aac1a1ef0634284da213205b3c1d98ffa2f038764a1e04d09b2ea

Indexed text · page 4

Show all pages
Page 4

Matrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 F: 973.240.1818 www.mnwe.com 4 23-1345-004 - PB24-15 (31-35 Harrison Avenue) filled in where it abuts the expansion. Additionally, the architectural plan indicates one stair exiting from the basement to the rear yard The Applicant shall provide testimony regarding the need for any external exits, steps, or fire escapes. 4. Grading and Drainage 4.1 Drainage plans were not provided. Based on the existing survey, it is unclear if existing drainage structures will need to be moved to accommodate the addition. Applicant shall provide any existing drainage plans and any plans for new runoff conveyance or stormwater management on site. 5. Soil Erosion & Sediment Control 5.1 The Applicant has provided details for the removal of the existing stone driveway and the intended installation of a slab foundation on grade, but no soil disturbances are depicted on the plans. The Applicant shall confirm the extent of soil disturbances for the proposed addition. 5.2 Although this action does not require a Soil Erosion and Sediment Control Permit, the Applicant shall provide a soil erosion and sediment control plan documenting measures to protect the site. 6. Site Lighting 6.1 According to the proposed site plan, existing exterior lighting will not be disturbed by the intended expansion. No additional exterior lighting is indicated on the expansion. The Applicant shall provide testimony regarding the site’s compliance with Township Ordinance §25-14.1, related to general lighting standards. 7. Landscaping 7.1 The proposed Site Plan indicates the intended removal of three trees on the property. The Applicant shall provide testimony regarding existing vegetation, and any related removals, replacements, or new planting areas. 7.2 Additionally, The Applicant shall provide testimony regarding the intention to obtain a Tree Removal Permit pursuant to Ordinance §25-27. 8. Utilities 8.1 The Applicant shall confirm if new utility service lines, laterals, connections, or associated appurtenances are needed for the proposed improvements. The

File revisions (1)