Supporting Documentation · Nov 21, 2024
Ltr Diane Chandler Zimmerman enc documents 91224
e408643d0d22d9a1144ceac94c8158d7c001c98013b3a2a5dae0be661f65e4c3Indexed text · page 19
Show all pagesoutfill structure for storm water drainage in its rear yard and is seeking the approval of the Essex County Planning Board and Township Engineer to construct an underground storm water detention basin connected to the County storm water system ag an alternative and, if approved, tha Applicant will preserve the existing rear lot that is undisturbed by the building addition as a lawn and reserva thergon 15 spaces for future parking. 5. This development will not have a harmful effect on the environment and thus the requirement for an Enviromental Impact Study is waived. 6. The development will not measurably increase traffic generated from the site and the traffic study requirement is waived. NOW, THEREFORE, BE IT RESOLVED that the requirements for a Traffic Study, an Environmental Impact Study, and the OB~2 Zone lighting requirements be and they herahy are waived with respect to this application; and BE IT FURTHER RESOLVED that the application for variance from the requirements of the parking regulations whereby 50 are required and 26 are Proposed, ba and it hereby is granted and the Applicant is also required to provide 15 spaces for reserved future parking if tha Eseex County Planning Board and the Township Engineer approve the Applicant’s underground stern water detention basin design; and BE IT FURTHER RESOLVED that the site Plan dated August 16, 1995, revised November 28, 1995, for property located a3-
File revisions (1)
- Sep 29, 2026
e408643d0d222,873,343 bytes