Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 12, 2024

Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size

Preserved file SHA-2562b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521

Indexed text · page 12

Show all pages
Page 12

Page 12 1 called and provided expert testimony in the field of 2 civil engineering for this project on September 12. 3 MR. BLAKE: Yes, that's correct. 4 MS. PORTER: And as part of that 5 testimony, you specifically addressed the site design 6 and proposed storm water management system for this 7 site, is that correct? 8 MR. BLAKE: Yes, that's correct. 9 MS. PORTER: And you determined, as part 10 of that testimony, that in order to comply with the 11 storm water management regulations and specifically, 12 the green infrastructure requirements, since the site 13 is considered a major development and must address 14 water quantity, that the number and location of storm 15 water management bioretention basins and under drains 16 were necessary for this project, is that correct? 17 MR. BLAKE: Yes, that's correct. 18 MS. PORTER: Okay, and you also testified 19 regarding the replacement fence and the existing 20 condition of that fence and brick pillars and the 21 need to bring that site into compliance with current 22 electrical code and PSE&G requirements, is that 23 correct? 24 MR. BLAKE: Yes. 25 MS. PORTER: Thank you. And finally, you

File revisions (1)