Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 12, 2024

Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size

Preserved file SHA-2562b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521

Indexed text · page 15

Show all pages
Page 15

Page 15 1 security. 2 MR. BLAKE: Yes, there was other people 3 there as well, but in general that was kind of the 4 core team. 5 MS. PORTER: Got it. And during that site 6 visit, what specifically did you focus on in terms of 7 the site? 8 MR. BLAKE: I mean, we kind of generally 9 looked at some equipment where the site is, but our 10 main focus was in the areas where the trees are 11 proposed to be removed, where a lot of Mr. Malanga 12 and the other people who've questioned the tree 13 removal, we went there to kind of revisit those trees 14 to see how we can, how it fit in with our design. 15 Some people hadn't been there for a while since the 16 design has progressed. I personally had never been 17 there so that was a good chance for me to visit, only 18 people from my team had been there. But, in general, 19 we kind of went over the lay of the land, we had 20 drawings in front of us to kind of give us a visual 21 picture of where the bioretention basins are, the 22 switch gear, the access drive, and where it was in 23 relation to what trees were in question. We looked 24 at, as far as, is there any other place we could put 25 the bioretention? I mean the site doesn't drain or

File revisions (1)