Supporting Documentation · Dec 12, 2024
Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size
2b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521Indexed text · page 16
Show all pagesPage 16 1 slope very much, so we really had to co-locate it in 2 an area where that was draining downhill, that was 3 kind of our best option where that was. 4 As far as access to the site, you know, 5 the existing drive kind of goes off towards the west 6 when you pull in and we need more of a straight 7 access into the site. The switch gear is a pretty 8 large building; now granted, it will come in multiple 9 pieces, but we needed to provide easy access for 10 those heavy halls. Additionally, there is existing 11 equipment like, there is a transformer on that side, 12 which, with the new equipment and everything the way 13 it's considered, the access to that portion of the 14 sub would be better if it was a straight on access. 15 Additionally, we kind of walked the fence 16 line, I can't say that I walked the entire length, 17 but we walked a good portion of it, looked at the 18 state of it, what kind of conditions it was in, noted 19 where there was some bad areas, pillars, the brick 20 pillars, saw the existing condition of those. 21 MS. PORTER: And what was that condition 22 that you observed? 23 MR. BLAKE: There was a lot of cracks, a 24 lot of, there was parts where there was missing 25 bricks or chunks out of the brick, I know that a lot
File revisions (1)
- Sep 29, 2026
2b801ed8f745432,571 bytes