Page 23 1 back to being on this site beyond specifically your 2 determination as to the location of the detention 3 basin, what other conclusions did you make in terms 4 of the remainder of the design as it relates 5 specifically to your civil engineer testimony and 6 knowledge? 7 MR. BLAKE: I mean, in my opinion the 8 design, you know, as far as the sequence of 9 construction, in order to accommodate both the 10 electrical equipment, the installation, the delivery 11 of the equipment, and also provide storm water 12 management in compliance with the rules, the, there 13 wasn't, I don't see any ways to really adjust the 14 design to make it a more efficient or reduce the tree 15 removal. I mean, the basins have been adjusted and 16 you know, tweaked as much as possible and I think 17 that the current design that we have, I believe the 18 current design that we have is the best solution. 19 MS. PORTER: Thank you. I have no further 20 questions for Mr. Blake. 21 CHAIRMAN NEUER: Thank you, Ms. Porter. 22 Let's start, because he was mentioned a few times, 23 Mr. Hess, any questions? 24 MR. HESS: I have no questions, Mr. 25 Chairman. I also reviewed the township ordinance and

File revisions (1)