Supporting Documentation · Dec 12, 2024
Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size
2b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521Indexed text · page 25
Show all pagesPage 25 1 that experience. Mine is just how to design a storm 2 water management system in accordance with the codes 3 or regulations. 4 MR. SCOTT: And you believe that the best 5 plan, the one that you've just been discussing, is 6 that the trees that are slated to come down, should 7 come down. 8 MR. BLAKE: I believe that the trees that 9 are located where the bioretention basins are and the 10 equipment, yes, I believe that that is the best 11 layout and design with the site constraints that we 12 have. 13 MR. SCOTT: Thank you. 14 CHAIRMAN NEUER: Thank you, Mr. Scott. 15 Mr. Sussman? 16 MR. SUSSMAN: No questions, Mr. 17 Chairman. 18 CHAIRMAN NEUER: And Ms. Porter, I have no 19 questions for the witness other than what we've 20 already discussed. Members of the public, this is 21 your opportunity to question the witness based upon 22 the testimony that he has presented, that's the scope 23 of your questioning. The timer that usually comes up 24 on the screen is broken, so I'm going to keep the 25 time on the questioning, the timing, and the clock
File revisions (1)
- Sep 29, 2026
2b801ed8f745432,571 bytes