Supporting Documentation · Dec 12, 2024

Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size

Preserved file SHA-2562b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521

Indexed text · page 30

Show all pages
Page 30

Page 30 1 that equipment, if, for whatever reason, it had to be 2 replaced. 3 MS. MALANGA: And are you saying that 4 they would be unable to replace equipment or make 5 repairs if you didn't cut down all those trees and 6 move the road? 7 MR. BLAKE: I didn't say that. 8 MS. MALANGA: Okay, well, if the road 9 has been functional for the past 100 years and 10 they've been able to make their repairs and do 11 whatever they need, why now do all these trees have 12 to be cut in order to straighten out a road today? 13 MR. BLAKE: If you look at the drawings, 14 I don't know, Ms. Malanga if you actually reviewed 15 the drawings, but there is not a lot of trees being 16 removed because of the realignment of the access 17 drive. 18 MS. MALANGA: Okay, thank you. 19 MR. BLAKE: The bioretention is what is-- 20 CHAIRMAN NEUER: Mr. Blake, you've 21 answered the question. Anything else, Ms. Malanga? 22 MS. MALANGA: That's all my questions. 23 Thank you. 24 CHAIRMAN NEUER: Mr. Fagan, who else do we 25 have?

File revisions (1)