Supporting Documentation · Dec 12, 2024
Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size
2b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521Indexed text · page 44
Show all pagesPage 44 1 not be cut down, where are they, are they in one 2 particular spot, are they all over, can you tell us, 3 and how large are they? 4 MR. FUTEY: They're primarily along the 5 fence line and it was in reevaluating the alignment 6 of the fence, and we even discussed this at our site 7 meeting as well. The nature of where the fence is 8 located and how we might be able to shift it even 9 slightly to accommodate those trees. Like I said, 10 they're primarily along Prospect Avenue, they're not 11 the largest of the trees on the site, they're in the 12 medium range. 13 MR. SCOTT: And just another question on 14 the landscaping and the need to do some shifting on 15 the road. The civil engineer testified that he 16 couldn't say exactly what size vehicles would be 17 needed to bring it in, so how can you decide, how can 18 it be decided how much roadway you need to cut away 19 to increase, what it that -- how is that -- what is 20 that based on if you don't know exactly what size 21 transport vehicle is required? 22 MR. FUTEY: I can't really comment on the 23 civil engineering. 24 MS. PORTER: For the record, the road 25 alignment is consistent with normal roadway width
File revisions (1)
- Sep 29, 2026
2b801ed8f745432,571 bytes