Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 12, 2024

Transcript 10 17 24 WO BOA ZB 24 06 PSEG Full size

Preserved file SHA-2562b801ed8f745c34df5de364c8782befb399b5841fa896cd5300cc2f08cbd9521

Indexed text · page 50

Show all pages
Page 50

Page 50 1 actually kind of rampant on the site right now with 2 the existing trees. So, most of those have already 3 been removed, and there is really not many more 4 slated for removal along the fence line. Where there 5 is a cluster, it is down by the entrance on Mount 6 Pleasant Avenue, they are slated for removal not 7 really because of the fence as much as the 8 bioretention basin that's going there because the 9 grading there, when we're grading down, we are gonna 10 be cutting out the root stock of those trees and the 11 viability of those, it's just, the long term health, 12 it's a risk, it's a safety hazard. 13 MS. WHITMER: Right, okay, thank you 14 very much. 15 CHAIRMAN NEUER: Thank you. Mr. Fagan, 16 any other hands up now? 17 MR. FAGAN: Mr. Chairperson, there are no 18 other hands raised. Oh, I'm sorry, one just came up. 19 Andy Macleod, welcome to the meeting, please state 20 your name and address for the record. 21 MR. MACLEOD: Hi, my name is Andrew 22 Macleod, 19 Fundus Road. 23 MR. FAGAN: Please continue. 24 MR. MACLEOD: Thank you so much, just a 25 quick question, a clarification really, apologies if

File revisions (1)