Supporting Documentation · Nov 6, 2024
2870 24 Amending and Supplementing Chapter 25 Section 29 of the Township of West Orange Municipal Code Stormwater Mgmt RedLined 2
e8e36eae42488282d26a18afa829a28ee9e2cd98879c295d250fac5bfe89a936Indexed text · page 1
Show all pages1 2870-24 AN ORDINANCE AMENDING AND SUPPLEMENTING CHAPTER 25, SECTION 29 OF THE REVISED GENERAL ORDINANCES OF THE TOWNSHIP OF WEST ORANGE BASED ON RECOMMENDATIONS OF THE NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES MANUAL BE IT ORDAINED BY THE MUNICIPAL COUNCIL OF THE TOWNSHIP OF WEST ORANGE, NEW JERSEY that Chapter 25, Section 29 et seq., requires amendments based on the recommendations from the New Jersey Stormwater Management Practices Manual as follows: § 25-29.1—Scope and Purpose: A. Policy Statement Flood control, groundwater recharge, and pollutant reduction shall be achieved through the use of stormwater management measures, including green infrastructure Best Management Practices (GI BMPs) and nonstructural stormwater management strategies. GI BMPs and low impact development (LID) should be utilized to meet the goal of maintaining natural hydrology to reduce stormwater runoff volume, reduce erosion, encourage infiltration and groundwater recharge, and reduce pollution. GI BMPs and LID should be developed based upon physical site conditions and the origin, nature and the anticipated quantity, or amount, of potential pollutants. Multiple stormwater management BMPs may be necessary to achieve the established performance standards for water quality, quantity, and groundwater recharge. B. Purpose The purpose of this ordinance is to establish minimum stormwater management requirements and controls for “major development,” as defined below in § 25-29.2. C. Applicability 1. This ordinance shall be applicable to the following major developments: a. Non-residential major developments; and b. Aspects of residential major developments that are not pre-empted by the Residential Site Improvement Standards at N.J.A.C. 5:21. 2. This ordinance shall also be applicable to all major developments undertaken by Township of West Orange. 3. An application required by ordinance pursuant to C.1 above that has been submitted prior to the adoption of this Ordinance, shall be subject to the stormwater management requirements in effect on one (1) day prior to the adoption date of this ordinance. Deleted: Section II
File revisions (1)
- Sep 29, 2026
e8e36eae4248821,416 bytes