Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 6, 2024

2870 24 Amending and Supplementing Chapter 25 Section 29 of the Township of West Orange Municipal Code Stormwater Mgmt RedLined 2

Preserved file SHA-256e8e36eae42488282d26a18afa829a28ee9e2cd98879c295d250fac5bfe89a936

Indexed text · page 13

Show all pages
Page 13

13 G. An alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate may be used if the design engineer demonstrates the capability of the proposed alternative stormwater management measure and/or the validity of the alternative rate or method to the municipality. A copy of any approved alternative stormwater management measure, alternative removal rate, and/or alternative method to calculate the removal rate shall be provided to the Department in accordance with § 25-29.6b. Alternative stormwater management measures may be used to satisfy the requirements at § 25-29.4o only if the measures meet the definition of green infrastructure at § 25-29.2. Alternative stormwater management measures that function in a similar manner to a BMP listed at § 25-29.4o2 are subject to the contributory drainage area limitation specified at § 25-29.4o2for that similarly functioning BMP. Alternative stormwater management measures approved in accordance with this subsection that do not function in a similar manner to any BMP listed at § 25-29.4o2 shall have a contributory drainage area less than or equal to 2.5 acres, except for alternative stormwater management measures that function similarly to cisterns, grass swales, green roofs, standard constructed wetlands, vegetative filter strips, and wet ponds, which are not subject to a contributory drainage area limitation. Alternative measures that function similarly to standard constructed wetlands or wet ponds shall not be used for compliance with the stormwater runoff quality standard unless a variance in accordance with N.J.A.C. 7:8-4.6 or a waiver from strict compliance in accordance with § 25-29.4d is granted from § 25-29.4o. H. Whenever the stormwater management design includes one or more BMPs that will infiltrate stormwater into subsoil, the design engineer shall assess the hydraulic impact on the groundwater table and design the site, so as to avoid adverse hydraulic impacts. Potential adverse hydraulic impacts include, but are not limited to, exacerbating a naturally or seasonally high-water table, so as to cause surficial ponding, flooding of basements, or interference with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper

Page 13

s, or interference with the proper operation of subsurface sewage disposal systems or other subsurface structures within the zone of influence of the groundwater mound, or interference with the proper functioning of the stormwater management measure itself. I. Design standards for stormwater management measures are as follows: 1. Stormwater management measures shall be designed to take into account the existing site conditions, including, but not limited to, environmentally critical areas; wetlands; flood-prone areas; slopes; depth to seasonal high-water table; soil type, permeability, and texture; drainage area and drainage patterns; and the presence of solution-prone carbonate rocks (limestone); 2. Stormwater management measures shall be designed to minimize maintenance, facilitate maintenance and repairs, and ensure proper functioning. Trash racks shall be installed at the intake to the outlet structure, as appropriate, and shall have parallel bars with one-inch spacing between the bars to the elevation of the water quality design storm. For elevations higher than the water quality design storm, the parallel bars at the outlet structure shall be spaced no greater than one-third the width of the diameter of the orifice or one-third the width of the weir, with a minimum spacing between bars of one inch and a maximum spacing Deleted: Section VI.B Deleted: Section IV.O Deleted: Deleted: Section II Deleted: Section O.2 Deleted: Section O.2 Deleted: Deleted: Section O.2 Deleted: Section IV.D Deleted: Section IV.O

File revisions (1)