Supporting Documentation · Nov 6, 2024
2870 24 Amending and Supplementing Chapter 25 Section 29 of the Township of West Orange Municipal Code Stormwater Mgmt RedLined 2
e8e36eae42488282d26a18afa829a28ee9e2cd98879c295d250fac5bfe89a936Indexed text · page 14
Show all pages14 between bars of six inches. In addition, the design of trash racks must comply with the requirements of § 25-29.8c; 3. Stormwater management measures shall be designed, constructed, and installed to be strong, durable, and corrosion resistant. Measures that are consistent with the relevant portions of the Residential Site Improvement Standards at N.J.A.C. 5:21-7.3, 7.4, and 7.5 shall be deemed to meet this requirement; 4. Stormwater management BMPs shall be designed to meet the minimum safety standards for stormwater management BMPs at § 25-29.8; and 5. The size of the orifice at the intake to the outlet from the stormwater management BMP shall be a minimum of two and one-half inches in diameter. J. Manufactured treatment devices may be used to meet the requirements of this subchapter, provided the pollutant removal rates are verified by the New Jersey Corporation for Advanced Technology and certified by the Department. Manufactured treatment devices that do not meet the definition of green infrastructure at § 25-29.2 may be used only under the circumstances described at § 25-29.4o4. K. Any application for a new agricultural development that meets the definition of major development at § 25-29.2 shall be submitted to the Soil Conservation District for review and approval in accordance with the requirements at § 25-29.4o, p, q, and rand any applicable Soil Conservation District guidelines for stormwater runoff quantity and erosion control. For purposes of this subsection, "agricultural development" means land uses normally associated with the production of food, fiber, and livestock for sale. Such uses do not include the development of land for the processing or sale of food and the manufacture of agriculturally related products. L. If there is more than one drainage area, the groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § 25-29.4 p, q, and r shall be met in each drainage area, unless the runoff from the drainage areas converge onsite and no adverse environmental impact would occur as a result of compliance with any one or more of the individual standards being determined utilizing a weighted average of the results achieved for that individual standard across the affected drainage areas. M. Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be
e results achieved for that individual standard across the affected drainage areas. M. Any stormwater management measure authorized under the municipal stormwater management plan or ordinance shall be reflected in a deed notice recorded in the } (Essex County Register of Deeds and Mortgages, Hall of Records, 465 Martin Luther King Jr. Boulevard #130, Newark, N.J. 07102. A form of deed notice shall be submitted to the municipality for approval prior to filing. The deed notice shall contain a description of the stormwater management measure(s) used to meet the green infrastructure, groundwater recharge, stormwater runoff quality, and stormwater runoff quantity standards at § 25-29.4o, p, q, and rand shall identify the location of the stormwater management measure(s) in NAD 1983 State Plane New Jersey FIPS 2900 US Feet or Latitude and Longitude in decimal degrees. The deed notice shall also reference the maintenance plan required to be recorded upon the deed pursuant to§ 25-29.10b5 . Prior to the commencement of construction, proof that the above required deed notice has been filed shall be submitted to the municipality. Proof that the required information has been recorded on the deed shall be in the form of either a copy of the complete recorded document or a receipt from the clerk or other proof Deleted: Section VIII.C Deleted: Section VIII Deleted: Section II Deleted: Section IV.O.4 Deleted: Section II Deleted: Sections IV.O, P, Q and R Deleted: Deleted: Section IV.P, Q and R Deleted: Deleted: {insert Office of the County Clerk or the registrar of deeds and mortgages of the county in which the development, project, project site, or mitigation area containing the stormwater management measure is located, as appropriate, to the municipality… Deleted: Section IV.O, P, Q and R Deleted: Deleted: Section X.B.5
File revisions (1)
- Sep 29, 2026
e8e36eae4248821,416 bytes