Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 21, 2024

Final 691 Eagle Rock Avenue Maint Manual

Preserved file SHA-2566c1dc09d57e5ad6c2b316897191c4f57ff1a84bada374b09e09c47df1b6d2427

Indexed text · page 15

Show all pages
Page 15

INSPECTION CHECKLIST 14. During the rainfall season, inspect and check condition of unit at east once every 30 days 2. Ascertain that the unit is funcioning properly (no blockages or obstructions to inlet and/or separation screen) 3. Measure amount of solid material s that have accumulated in the sump (Unit should be cleaned when the sump is 75-85% full) 4. Measure amount of fine sediment accumulated behind the screen 5. Measure amount of floating trash and debris in the separation chamber MAINTENANCE CHECKLIST 4. Cleanout unit at the end and beginning of the rainfall season 2. Pump down unit (at least once a year) and thoroughly inspect separation chamber, separation screen and oil baffle 3. No visible signs of damage or loosening of bolts to internal components observed * * If there is any damage to the internal components or any fasteners are damaged or missing please contact CONTECH (800.338.1122).

File revisions (1)