Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 21, 2024

M_ZB 691 Eagle Rock Ave Engineering Forestry 4

Preserved file SHA-256d064057a683cc462ca500b4c405eb4cd0c8e398679256fea1abe9ff14ba35c9a

Indexed text · page 5

Show all pages
Page 5

AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org  Addressed. Asphalt Pavement Detail for private streets and parking areas has been revised to reference current NJDOT HMA and it in agreement with the Pipe Installation and Pavement Restoration detail. 4.14. Testimony should be provided regarding HVAC, generator and other Mechanical equipment.  Applicant’s professional provided testimony at the last board meeting. 4.15. The proposed Site Plan shows two arrows for vehicles maneuvering. However, vehicle turning templates should be provided showing the various vehicle movements with turning radii and space available to make a turn.  Partially addressed. Turning template for vehicle’s movement is shown on the plan without turning radii. 4.16. It is recommended that a sight triangle be provided to ensure that the driveway intersection with Eagle Rock Avenue has an unobstructed view for vehicles and pedestrians as requested at August meeting.  Partially addressed. The front of the vehicle exiting the driveway should be at a minimum of 10 feet behind the curb line. Applicant’s professional needs to provide clarification that at the intersection of the driveway there is no hedge planting, fence, wall or any obstruction higher than 30 inches to motorist’s line of sight. 4.17. It is assumed the Applicant/Owner will own and be responsible for on-site water and sewer improvements. This should be confirmed. V. PERMITS 4.1. Should the Board approve this application: 4.1.1. Certification from the Hudson-Essex-Passaic Soil Conservation District will be required if more than 500 sf of disturbance will occur. 4.1.2. Soil removal permit will be required if more than 300 CY of soil will need to be moved. 4.1.3. A street opening permit for work within the ROW will need to obtain from County. 4.1.4. A sewer permit and fee application will need to be obtained from the Engineering Department. 4.1.5. A tree removal application and permit will be required from the Township Forester.

File revisions (1)