Supporting Documentation · Mar 20, 2025
ZB 22 13 2023 04 06 Twp Resubmission Letter
39f16dbaa7006bb91b6ec646266d4f680744e80bfe6613209751e7f735f4f2d0Indexed text
www.dynamicec.com Lake Como, NJ • Chester, NJ • Toms River, NJ • Newark, NJ • Newtown, PA • Philadelphia, PA Bethlehem, PA • Allen, TX • Houston, TX • Austin, TX • Delray Beach, FL • Annapolis, MD Dynamic Engineering Consultants, PC 1904 Main Street Lake Como, NJ 07719 T. 732-974-0198 April 6, 2023 Via Hand Delivery Township of West Orange Zoning Board of Adjustment 66 Main Street West Orange, NJ 07052 Attn: Diana Chandler-Zimmermann Zoning Board Secretary RE: Orange Dev, LLC Proposed Popeyes & Sonic Restaurant 470 Eagle Rock Avenue (CR 611) Block 153, Lot 38 Township of West Orange Essex County, New Jersey DEC# 1021-99-025 ZB-22-13 Dear Ms. Chandler-Zimmermann, On behalf of the applicant, Orange Dev, LLC, this letter shall serve as the formal resubmission to the Township of West Orange Zoning Board of Adjustment towards issuance of Site Plan Approval for the above referenced project. Enclosed please find the following items: • Six (6) copies of the Variance and Waiver List, prepared by our office, dated 4/5/2023; • Six (6) copies of the Architectural Plans, prepared by G141 Architecture, LLC; • Six (6) signed copies of the Acoustical Evaluation of Proposed Outdoor Equipment, prepared by Michael J. Dick, INCE Bd. Cert. of Lewis S. Goodfriend & Associates, dated 3/30/2023; • Six (6) signed and sealed copies of the Drainage Statement, prepared by our office, dated October 2022, last revised March 2023; • Six (6) signed and sealed copies of the Stormwater Management Operation & Maintenance Manual, prepared by our office, dated October 2022, last revised March 2023; • Six (6) signed and sealed copies of the Traffic Impact Study, prepared by Dynamic Traffic LLC, dated 10/21/2022, last revised 4/5/2023;
Township of West Orange April 6, 2023 Page 2 of 2 • Six (6) signed and sealed copies of the Tree Removal Report, prepared by our office, dated October 2022, last revised April 2023; and • Six (6) signed and sealed copies of the Preliminary and Final Site Plan Drawings, prepared by our office, dated 11/9/2022, last revised 3/31/2023. Please review the enclosed documents towards issuance of Site Plan Approval for the above referenced project. Should you have any questions or require additional information, please do not hesitate to contact the undersigned. Sincerely, DYNAMIC ENGINEERING CONSULTANTS, PC Matthew Bersch, PE Danny Goncalves Enclosures cc: Benjamin T.F. Wine, Esq. (via email) Ed Baksh (via email) Lawrence BenBassett (via email)
File revisions (1)
- Sep 29, 2026
39f16dbaa700650,321 bytes