Supporting Documentation · Mar 20, 2025
ZB 22 13 2023 03 Drainage Statement
46401c7b2efcae94a4ba898b8b97993c86b297b1443a87ec327177bdbec7df80Indexed text · page 2
Show all pagesTABLE OF CONTENTS Page No. I. Drainage Summary .................................................................................... 3 APPENDIX • Location Map • USGS Map • NRCS Web Soil Survey • Time of Concentration (Tc) Calculations • Runoff Curve Number (CN) Calculations – Existing • Runoff Curve Number (CN) Calculations – Proposed • Hydrograph Summary Reports – Existing and Proposed Conditions 2 yr. 10 yr. & 100 yr. • Multi-Hydrograph Plot – Existing and Proposed Conditions Superimposed 2 yr. 10 yr. & 100 yr. • Stormwater Collection System Calculations (Pipe Sizing) • Drainage & Inlet Area Maps Orange Dev, LLC October 2022 DEC# 1021-99-025 2 Last Revised March 2023