Supporting Documentation · Mar 20, 2025
ZB 22 13 2023 03 Drainage Statement
46401c7b2efcae94a4ba898b8b97993c86b297b1443a87ec327177bdbec7df80Indexed text · page 26
Show all pages3 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.696 1 725 9,778 ---- ------ ------ Existing Site (Impervious) 2 SCS Runoff 0.224 1 726 740 ---- ------ ------ Existing Site (Pervious) 3 Combine 2.913 1 725 10,518 1, 2 ------ ------ Existing Total 5 SCS Runoff 2.343 1 725 8,497 ---- ------ ------ Proposed Site (Impervious) 6 SCS Runoff 0.460 1 726 1,463 ---- ------ ------ Proposed Site (Pervious) 7 Combine 2.795 1 726 9,960 5, 6 ------ ------ Proposed Total 2023-04-03 2, 10, 100 yr.gpw Return Period: 2 Year Wednesday, Apr 5, 2023
File revisions (1)
- Sep 29, 2026
46401c7b2efc5,992,199 bytes