Supporting Documentation · Mar 20, 2025
2023 07 06 TRAFFIC IMPACT STUDY
fcc2431925338c315a29bab1fd593fc464da3b90675835bd85b1caa2b7f6bb8eIndexed text · page 36
Show all pagesHCS Two-Way Stop-Control Report General Information Site Information Analyst JMR Intersection Eagle Rock & W. Site Dway Agency/Co. Dynamic Traffic Jurisdiction Essex County Date Performed 7/6/2023 East/West Street Eagle Rock Avenue Analysis Year FB North/South Street West Site Driveway Time Analyzed PM PSH Peak Hour Factor 0.97 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description 1021-99-025T Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 2 0 0 0 2 0 0 0 1 0 0 0 Configuration T TR LT T R Volume (veh/h) 761 27 6 659 7 Percent Heavy Vehicles (%)
761 27 6 659 7 Percent Heavy Vehicles (%) 0 2 Proportion Time Blocked Percent Grade (%) 0 Right Turn Channelized No Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec) 4.1 6.9 Critical Headway (sec) 4.10 6.94 Base Follow-Up Headway (sec) 2.2 3.3 Follow-Up Headway (sec) 2.20 3.32 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 6 7 Capacity, c (veh/h) 823 594 v/c Ratio 0.01 0.01 95% Queue Length, Q₉₅ (veh) 0.0 0.0 Control Delay (s/veh) 9.4 0.1 11.1 Level of Service (LOS) A A B Approach Delay (s/veh) 0.2 11.1 Approach LOS
B Approach Delay (s/veh) 0.2 11.1 Approach LOS A B Copyright © 2023 University of Florida. All Rights Reserved. HCS™ TWSC Version 2023 Generated: 7/6/2023 11:28:39 AM FB PM - Eagle Rock Ave & West Site Driveway.xtw
File revisions (1)
- Sep 29, 2026
fcc2431925333,530,743 bytes