Supporting Documentation · Mar 20, 2025
2023 07 10 Twp Resubmission Letter
63a6086ddc8ad47b34b10b4c0efcb5bcadfc956e0ce04dedba7de8333635fdbdIndexed text · page 10
Show all pagesTownship of West Orange July 7, 2023 Page 10 of 12 Lighting Comments: 1. In accordance with Section 25-14.3, a minimum of 2.0 footcandles is required for parking areas; whereas the applicant has proposed a minimum of 0.7 footcandles. Staff notes that this meets IES (Illuminating Engineering Society) standards. Information. 2. Revise the plans to provide the concrete strength for proposed light pole foundation detail, sheet 13 of 17. Staff recommends a strength of 4,500 PSI. The Construction Details (Sheet 14 of 20) has been revised to provide 4,500 PSI concrete strength. 3. Revise the plans to indicate proposed timers and hours of operation. Staff recommends light levels be dimmed during non-operational hours, to reduce light pollution. The Lighting Plan (Sheet 10 of 20) has been revised to note the proposed hours of operation and required timers for lighting to be dimmed during non-operational hours. 4. Indicate the proposed color and finish for all light fixtures and poles. The Lighting Details (Sheet 12 of 20) has been revised to provide details of all proposed light fixtures and poles. 5. Revise the plans to provide isolux pattern details with a scale and graph to correspond with the proposed fixtures. The Lighting Details (Sheet 12 of 20) has been revised to provide photometric pattern details of the proposed light fixtures. 6. Provide the manufacturer's catalog cuts and ordering information for proposed light poles and fixtures, for further review. Also, indicate the proposed Kelvin light color temperature. The Lighting Details (Sheet 12 of 20) has been revised to provide the proposed lighting details. Board Planner’s Review Letter, prepared by Paul Grygiel, AICP, PP, Township Planner, dated April 17, 2023 Introduction Information Land use/Circulation Information
File revisions (1)
- Sep 29, 2026
63a6086ddc8a763,070 bytes