Supporting Documentation · Mar 20, 2025
470 Eagle TIS 6 4 24
8dc1df2d34cb7518854c9a7aebd32c7b155c9d9341fdffe4c1690e832a451749Indexed text · page 37
Show all pagesHCS Two-Way Stop-Control Report General Information Site Information Analyst JTT Intersection Eagle Rock & Rosney/Dway Agency/Co. Dynamic Traffic Jurisdiction Essex County Date Performed 04/24/24 East/West Street Eagle Rock Avenue Analysis Year EX North/South Street Rosney Terrace/Driveway Time Analyzed AM PSH Peak Hour Factor 0.93 Intersection Orientation East-West Analysis Time Period (hrs) 0.25 Project Description 1021-99-025T Lanes Major Street: East-West Vehicle Volumes and Adjustments Approach Eastbound Westbound Northbound Southbound Movement U L T R U L T R U L T R U L T R Priority 1U 1 2 3 4U 4 5 6 7 8 9 10 11 12 Number of Lanes 0 0 2 0 0 0 2 0 0 1 0 0 1 0 Configuration LT TR LT TR LTR LTR Volume (veh/h) 1 544 5 7 443 0 4 0 5 1
LTR Volume (veh/h) 1 544 5 7 443 0 4 0 5 1 0 0 Percent Heavy Vehicles (%) 0 0 0 0 0 0 0 0 Proportion Time Blocked Percent Grade (%) -2 2 Right Turn Channelized Median Type | Storage Undivided Critical and Follow-up Headways Base Critical Headway (sec) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9 Critical Headway (sec) 4.10 4.10 7.10 6.10 6.70 7.90 6.90 7.10 Base Follow-Up Headway (sec) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 Follow-Up Headway (sec) 2.20 2.20 3.50 4.00 3.30 3.50 4.00 3.30 Delay, Queue Length, and Level of Service Flow Rate, v (veh/h) 1 8 10 1 Capacity, c (veh/h) 1096 995 427 258 v/c Ratio 0.00 0.01 0.02 0.00 95% Queue Length, Q₉₅ (veh) 0.0 0.0 0.1 0.0 Control Delay (s/veh) 8.3 0.0 8.6 0.1
0.1 0.0 Control Delay (s/veh) 8.3 0.0 8.6 0.1 13.6 19.0 Level of Service (LOS) A A A A B C Approach Delay (s/veh) 0.0 0.2 13.6 19.0 Approach LOS A A B C Copyright © 2024 University of Florida. All Rights Reserved. HCS™ TWSC Version 2022 Generated: 4/24/2024 11:30:55 AM EX AM - Eagle Rock Ave & Rosney Terr-Dway.xtw
File revisions (1)
- Sep 29, 2026
8dc1df2d34cb1,847,321 bytes