Supporting Documentation · Mar 20, 2025
470 Eagle Drainage Reports 06 2024
08d7bc4c818156345f5284afb74efe06e20a3e5763aad5bea1450701deccb48fIndexed text · page 5
Show all pagesVI. Water Quality Per NJAC 7:8-5.5(a), the project is not required to meet the stormwater runoff quality standards as the project results in a decrease in motor vehicle surface area. This reduction provides a decrease in total suspended solid (TSS) generation for the site, improving the quality of stormwater runoff leaving the site. VII. Conclusion In conclusion, the proposed project has been designed to ensure the safe and efficient control of stormwater runoff in a manner that will not adversely impact the existing drainage patterns or adjacent properties. The project is designed to comply with the stormwater runoff quantity and groundwater recharge requirements set forth under NJAC 7:8 and the Township of West Orange Land Use Ordinance. With this stated, it is evident that the proposed development will not have a negative impact on or within the vicinity of the site, and the increase in pervious coverage will benefit the area. MPB Realty, LLC June 2024 DEC# 1021-99-025 5
File revisions (1)
- Sep 29, 2026
08d7bc4c818113,185,605 bytes