Supporting Documentation · Mar 20, 2025
470 Eagle SWM OM 06 2024
2347dee67ab41c87a91639cbd49e7f86fb156b53f473531a4dbefb149d493ddbIndexed text · page 10
Show all pagesd) Wheel Barrows e) Painting Equipment f) Gloves 6. Materials a) Topsoil b) Fill c) Seed & Soil Amenities (Fertilizer, Lime, etc.) d) Chemicals (Pesticides, Herbicides, etc.) e) Mulch f) Paint Removers g) Spare Parts for Equipment 7. Parking Maintenance Equipment a) Sweeping/Vacuuming Equipment b) Snow Plowing Equipment c) Snow Shovels C. Checklists and Logs The Appendix of this report contains sample checklists and logs regarding various aspects of the basin maintenance and inspection. A brief description of the use of each form is listed below: 1. “Maintenance Work Order and Checklist” – a comprehensive form outlining both required and completed maintenance work. 2. “Maintenance Log” – a summary table for recording the results of all maintenance of the basin. 3. “Inspection Log” – a summary table for recording the results of all inspections of the basin. D. Estimated Maintenance Costs and Tasks The following is a summary of the required maintenance tasks and associated costs in written and tabular form: - Inspections to be performed by a consulting engineer on a bi-annual basis. - $3,000.00. Operation & Maintenance Manual 8 June 2024 DEC# 1021-99-025
File revisions (1)
- Sep 29, 2026
2347dee67ab42,299,891 bytes