Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 19, 2024

07152401 2

Preserved file SHA-256e89e6f0a21aba41dc55e53bb5326aa221007b07e2f5ef6105d3780bd9ede02f9

Indexed text · page 2

Show all pages
Page 2

~ For District Use Only He Jersey Natural soured Aa -E- HO onservation Program A —_———$— thi. His APPLICATION FOR SOIL EROSIO: AND SEDIMENT CONTROL PLAN CERTIFICATION piss enclosed soil erosion and sediment control plan and supporting information are submitted for certification pursuant to the Soil Erosion and Sediment Control Act, Chapter 251, PLL 1975 as amended (NISA 4:24-39 et. seq.) An application for certification of a soil erosion and sediment control plan shall include the items listed on the reverse'side of this form. Naneof Preis Proposed Single-Family Residential Dwelling | Pie Lecstio eases Township of West Orange mess e=4 0 Ridge Road *“80.03 “10 Project Owners) Email Name Aaron Friedman afried398@gmail.com| #a¢* (973)738-9767 Project Owner(s) Street Address (No P.O. Box Numbers) 139 Tennyson Drive City Short Hills State NJ Zip 07078 Total Project Area Total Disturbed Area Total Soil Restoration Area No. Dwelli er th F jal Tag aos jo Bvéllngeeher tis ee 0.97 0.97 N/A 1 > 750.00 Plans Prepared by* Eiiail of plan preparer Phone # (732) 974-0198 Fax? (732) 974-3521 State Zip 1904 Main Street “Lake Como NJ 07719 *(Engincering related items of the Soil Erosion and Sediment Com licensed in the State of New Jersey, in accordance with NIAC 1 Agent Responsible During Construction Dynamic Engineering Consultants, PC - Matthew J. Bersch, PE anbeech@dyramiceccom Street Address ‘01 Plan MUST be prepared by or under the direction of and be sealed by a Professional Engineer or Architect 7-6.1 et, seq.) TBD Email Street Address City State Zip Phone Fax # ‘The applicant hereby certifies that all soil erosion and sediment control measures are designed in accordance with current Standards for Soil Erosion and Sediment Control In New Jersey and will be installed in accordance with those Standards and the plan as approved by the Soil Conservation District and agrees as follows: « To notify the District in writing at leest 48 hours in advance of any land 4. To allow District agents to go upon project lands for inspection. disturbance activity. Failure to provide such notification may result in additional inspection foes That any conveyance of thi Will transfer full responsibil To notify the District upon completion of the Project (Note: No certificate subsequent owners. occupancy can be granted until a report of compliance is issued by

Page 2

f thi Will transfer full responsibil To notify the District upon completion of the Project (Note: No certificate subsequent owners. occupancy can be granted until a report of compliance is issued by the roject or portion thereof prior to its completion for compliance with the certified plan to any District 6. To comply with all terms and conditions of this application and certified plan including payment of all fees prescribed by the district fee schedule hereby 3. To maintain a copy of the certified plan on the project site during construction. incorporated by reference. The applicant hereby acknowledges that structural measures contained in the Soil Erosion and Sediment Control Plan are reviewed for adequacy to reduce offsite soil erosion and sedimentation and not for adequacy of structural design, The applicant shall retain full responsibility for any damages which may result from any construction activity notwithstanding district certification of the subject soil erosion and sediment control plan. It is understood that approval of the plan submitted with this application shall be valid only for the duration of the initial project approval granted by the municipality. All municipal renewals of this project will require submission and approval by the district. tn no case shall the approval extend beyond three- and one-half years at which time resubmission and certification will be required. Soil Erosion and Sediment Control Plan certification is limited to the controls specified in the plan. It is not authorization to engage in the proposed land use unless such use has been previously approved by the municipality or other controlling agency. Itis further understood that all documents, site plans, design reports etc, submitted to the district shall be made available to the public (upon request) pursuant to the Open Public Records Act, NuLS.A. 47:1A- el sea. 1. Applicant Ceitification* . 3. Plan dogermined complete: ee, sane MeCN Faceclinan A _—~” — 7 A/24 Signature Date 04/08/2024 Signature of District Official Date Applicant Name (Print) Aaron Friedman 2. Receipt of fee, plan and supporting documents is hereby acknowledged: 4. Plan certified, denied or other actions noted above, Special Remarks: ube SSCC251 “APIO 4/19 gid Signature of District SEE one —— Date L sigs ELE Fi 7 *Tf other than project citin authorization of owner must be

Page 2

, denied or other actions noted above, Special Remarks: ube SSCC251 “APIO 4/19 gid Signature of District SEE one —— Date L sigs ELE Fi 7 *Tf other than project citin authorization of owner must be attached. A2-2

File revisions (1)