Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 4, 2024

Filing Letter to Board in Response to M Bennett Email with Exhibits 12 02 2024

Preserved file SHA-2568d6c31704941a25307d37c2154a0f8bc3a4cd3522ed1b8e13d7965a5bb610530

Indexed text · page 21

Show all pages
Page 21

submit to this Board, with a copy to the Board Engineer, proof that it has obtained all required governmental approvals. 2. If another governmental entity or agency grants a waiver or variance affecting the plans and/or exhibits submitted by the Applicant, this approval or the conditions attached to it, then the Applicant shall re-apply to this Board respecting the same and this Board shall have the right to view that issue as it relates to this approval and these conditions and modify and amend same, if appropriate. 3. In the event that any other required regulatory approval conflicts with the terms and conditions hereof, or materially alters the same, or the terms and conditions hereof are materially altered by any change in applicable law or regulation other than those municipal regulations for which change is prohibited by the Municipal Land Use Law (MLUL), or in the event Applicant or its successors or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this approval, the Board hereby reserves the right to withdraw, amend or supplant the instant approval. 4. Allconstruction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. 5. The Applicant shall pay all outstanding taxes, tax liens, application fees and technical review fees, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of notification or this approval shall be deemed withdrawn. 6. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. Ts All conditions of approval shall be written on the site plans. 8. Applicant to comply with the review letters from Bowman Consulting dated August 29, 2017 except for Item #17. 9. Applicant shall comply with the recommendation in the Memo from Township Forrester John Linson dated October 4, 2017 which states: “Il recommend that the Applicant be required to amend the landscape plans to provide for the

Page 21

with the recommendation in the Memo from Township Forrester John Linson dated October 4, 2017 which states: “Il recommend that the Applicant be required to amend the landscape plans to provide for the restoration of the disturbed area within 75’ of the property boundary.” 10. Applicant to provide an Engineer's estimate of the cost of improvements for calculation of Engineering inspection fees.

File revisions (1)