Supporting Documentation · Dec 19, 2024
CHECKLIST FOR TREE REMOVAL Construction Projects
ff5ada82bf3b1dba276966345e7611164c6f9581dabda8554407357872c5bf3bIndexed text · page 1
Show all pagesThis original is not a PDF. Page numbers below identify extracted text segments, not physical pages. Verify quotations against the preserved original.
CHECKLIST FOR TREE REMOVAL CONSTRUCTION APPLICATIONS/PROJECTS Submit Tree Removal Application; Provide a Letter from a Licensed Tree Expert (LTE) stating why the tree(s) need to be removed; Tree Removal Plan; includes location and diameters. Tree Protection Plan (for trees that are remaining); Tree Replacement Plan in accordance with the Township Ordinance; Soil Erosion Plan/Permit approved by the Hudson Essex Passaic Soil Conservation District (HEP SCD); $1,000.00 Fee for the Permit (Check made payable to the Township of West Orange); Installation of Silt Fence and Tree Protection Fence (snow fence not permitted) needs to be inspected prior to the commencement of tree removal and must remain in place throughout duration of the project; Must use a Licensed Tree Contractor who is registered with the Township (List of Registered Contractors found on our website) All non-registered contractors will be required to register with the Township prior to the approval of the permit *Forester must be on site while tree removal is taking place. Must give 2 week notice prior to the start of tree removal.
File revisions (1)
- Sep 29, 2026
ff5ada82bf3b13,335 bytes