Supporting Documentation · Dec 19, 2024
03 Final OM Manual Dec 9 2024
e727c07d403b7a58a9eac5151e0d8268bcc12b0281c824e305a4e033c9a5e1f7Indexed text · page 16
Show all pagesNAME OF FACILITY MAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES Mayfair Farms / Remarkable Foods LOCATION 481 Eagle Rock Avenue, West Orange, NJ DATE CREW WORK STARTED EQUIPMENT WORK COMPLETED WEATHER TOTAL MANPOWER OF WORK B. CORRECTIVE MAINTENANCE WORK ITEMS ITEMS | ITEMS |cOMMENTS AND SPECIAL INSTRUCTIONS REQUIRED] DONE REMOVAL OF DEBRIS AND SEDIMENT _| I STRUCTURAL REPAIRS. I I EMBANKMENTS AND SIDE SLOPES I I s DEWATERING BASIN MAINTENANCE CONTROL OF MOSQUITOES: I I ~ EROSION REPAIR, FENCE REPAIR SNOW AND ICE REMOVAL I I 10, OTHER WORK ITEMS C, AESTHETIC MAINTENANCE ITEMS ITEMS. REQUIRED DONE LOCATION AND COMMENTS: 7. GRAFFITI REMOVAL OO : (x) 2. GRASS TRIMMING 3. WEEDING. 4, OTHERS REMARKS (REFER TO ITEM NO. IF APPLICABLE) WORK ORDER PREPARED BY:
File revisions (1)
- Sep 29, 2026
e727c07d403b2,298,620 bytes