Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 19, 2024

03 Final OM Manual Dec 9 2024

Preserved file SHA-256e727c07d403b7a58a9eac5151e0d8268bcc12b0281c824e305a4e033c9a5e1f7

Indexed text · page 2

Show all pages
Page 2

TABLE OF CONTENTS 1.0 PROJECT DETAILS ... se 1.1 Introduction and Description of Facilitie: 1.2 Project Contacts: 2.0 INSPECTION AND MAINTENANCE. .............. 2.1 Routine Inspection and Maintenance of the Stormwater Management Facilitie: 2.1.1 Preventative Maintenance Procedures: 2.1.2 Corrective Maintenance Procedures: -3 Aesthetic Maintenance Procedures:. 4 Summary of Maintenance Procedures: 5 6 Maintenance Equipment and Materials Checklists and Logs Appendix 1. “Maintenance Work Order and Checklist” - a comprehensive form outlining both required and completed maintenance work. 2. “Maintenance Log” - a summary table for recording of all maintenance work at the site. 3. “Inspection Log” — a summary table for recording the results of all inspections of the basins.

File revisions (1)