M_ZB 15 N Edgewood Avenue Memo2 Revised
4f99ee86fe37800567abd12bb368213740f7313fc8e70a3a7f9758cd1b2a2f49Indexed text · page 3
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org Not addressed. Architectural plans with details were not submitted. Plans show a wall height of 3.2 feet. Detail shown on architectural plan needs to match wall height shown on site plan. 3.6 Prior to commencing construction activities, soil erosion and sediment control measures must be in place and maintain until the disturbed ground is permanently stabilized; Addressed by Applicant’s Professional. Note #6 on Sheet SP-1 was provided showing soil erosion and sediment control measures will be in place prior to construction and maintained throughout construction. 3.7 There is a guy wire from the pole closest to the drywell along the northwesterly property line that needs to be shown on the plans (Refer to picture). Applicant’s professional to provide testimony as to the construction methods to protect the guy wire and pole. Addressed by Applicant’s Professional. 3.8 The project proposes to increase impervious coverage and a stormwater management system (in the form of one drywell with an open grate is illustrated on the Site Plan. Applicant’s professional must provide calculations demonstrating that the drywell has been adequately sized to accommodate runoff from the tributary drainage area for 6 inches that is closed to the 25-year storm; Addressed by Applicant’s Professional. Drywell calculations have been adjusted to accommodate for a 25-year storm. Proposed capacity can handle the volume required.
File revisions (1)
- Sep 29, 2026
4f99ee86fe373,563,651 bytes