Supporting Documentation · Dec 19, 2024
M_ZB 15 N Edgewood Avenue Memo2 Revised
4f99ee86fe37800567abd12bb368213740f7313fc8e70a3a7f9758cd1b2a2f49Indexed text · page 5
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org Partially Addressed. A map to scale showing the location of the drywells in the manual is to be submitted with the manual once permeability test is performed and confirmed that the proposed design works. Also, revised the block number in the report to Block 158 instead of 45.06. IV. PERMITS Should the Board approve this application: 4.1 Certification from the Hudson-Essex-Passaic Soil Conservation District will be required if more than 5,000 sf of disturbance will occur. 4.2 Soil removal permit will be required if more than 300 CY of soil will need to be moved. 4.3 A street opening permit is required for any work within the ROW. 4.4 A tree removal application and permit will be required from the Township Forester if any trees are to be removed. 4.5 We recommend an “As-Built Topographic Plan” be submitted prior to the issuance of a certificate of occupancy. Please contact us should you have any questions.
File revisions (1)
- Sep 29, 2026
4f99ee86fe373,563,651 bytes