Supporting Documentation · Jan 16, 2025
12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size
9bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0Indexed text · page 112
Show all pagesPage 112 1 elaborate on that, please? 2 A. I have been responsible for the design 3 of substations that -- the upper voltage is 230kV, 4 which I believe is what this site is, and have, over 5 the course of probably the last 25 years, have been 6 involved in 12 to 15 substation designs. 7 MR. TURTELTAUB: And what I'd like to 8 do, Mr. Chairman, if I could is have Mr. Blanton be 9 qualified as a civil engineer in this matter, as well 10 as with his understanding of electrical facilities, 11 substation facilities such as that's before the board 12 tonight. 13 THE WITNESS: I would like to qualify 14 that be as an electrical engineer, not a civil 15 engineer. 16 MR. TURTELTAUB: I'm sorry, an 17 electrical engineer. 18 My apologies. 19 CHAIRMAN NEUER: My silence is due to 20 taking notes. I am not ignoring either one of you. 21 So that, let's be more specific -- try 22 to be specific. The area of expertise, you're 23 seeking to qualify him as an electrical engineer with 24 experience in substation design. 25 MR. TURTELTAUB: Yes.
File revisions (1)
- Sep 29, 2026
9bbf98ce9f61680,485 bytes