Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 16, 2025

12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size

Preserved file SHA-2569bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0

Indexed text · page 113

Show all pages
Page 113

Page 113 1 CHAIRMAN NEUER: Is that correct? 2 MR. TURTELTAUB: Yes. 3 CHAIRMAN NEUER: Board have questions 4 on qualifications? 5 MS. PORTER: Yes. 6 VOIR DIRE EXAMINATION 7 BY MS. PORTER: 8 Q. My question is what specific experience 9 does he have regarding switching stations? 10 A. This is a combination of switching 11 station and a step-down station to go from 230kV down 12 to the distribution voltage as shown on the plans of 13 26kV, and that has been the primary focus of my work, 14 but I've also been involved in designing ring bus 15 switching stations similar to what is existing on 16 this site that is not being -- nothing's being 17 changed as far as the transmission switching. 18 Q. And my only other question would be, 19 what specific experience do you have in New Jersey? 20 A. My experience in New Jersey is limited 21 to working with Sussex Electric co-op, where we were 22 assisting them on getting some transmission -- sub 23 transmission out of a couple of their existing 24 substations for some maintenance work they needed to 25 do.

File revisions (1)