Supporting Documentation · Jan 16, 2025
12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size
9bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0Indexed text · page 114
Show all pagesPage 114 1 So my experience in New Jersey is 2 limited. 3 Q. Okay. So was that with respect to 4 transmission, not -- not specifically with respect to 5 replacement of equipment? 6 A. I have also been involved in numerous 7 substation upgrades or retrofits where you're 8 replacing existing equipment, and one large municipal 9 that we're working with now is upgrading their 10 substations, and we're doing two to three substation 11 upgrades a year where we're replacing old existing 12 equipment with newer equipment. 13 You know, and part of that work 14 involved having to maintain power during the entire 15 process to all the members and minimizing the impact 16 that we have with trees and having to stay lots of 17 times inside the existing perimeter of the substation 18 fence. 19 Q. Thank you. 20 But that experience was limited to 21 situations outside New Jersey, correct? 22 A. That is correct. 23 MS. PORTER: Thank you. 24 CHAIRMAN NEUER: Members of the Board, 25 any questions with respect to qualifications as an
File revisions (1)
- Sep 29, 2026
9bbf98ce9f61680,485 bytes