Page 117

Page 117 1 they're replacing existing older equipment, and we're 2 doing two to three substations a year for them, and 3 we've been doing that for about five years. 4 CHAIRMAN NEUER: Okay. You answered my 5 question. 6 Thank you. 7 And as I was saying, you are accepted 8 as an expert, as a licensed professional engineer in 9 the State of New Jersey with experience in substation 10 design. 11 And I thank you. 12 DIRECT EXAMINATION 13 BY MR. TURTELTAUB: 14 Q. But just to qualify, one quick 15 question, Mr. Blanton, if you could. 16 When you talk about the design of a 17 substation in New Jersey versus North Carolina or 18 anywhere else you might design it, do -- does the 19 state matter in how you design it or is it the -- is 20 it the facility itself that tells you what you have 21 to do? 22 A. There are the National Electric Safety 23 Code and OSHA regulations how it has to be designed, 24 and they are the -- NESC and OSHA are -- have been 25 adopted by just about every state, and we design to

File revisions (1)