Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 16, 2025

12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size

Preserved file SHA-2569bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0

Indexed text · page 120

Show all pages
Page 120

Page 120 1 development for the substation -- the site plan for 2 the substation being -- equipment being added and 3 realizing that, you know, it is obvious that Public 4 Service is removing a lot of the old structures 5 coming off of the three transformers on this site. 6 Q. This type of work and this type of 7 project, in the description of the work that you were 8 giving before when we were getting you qualified as 9 an expert, is this the type of plans that you've 10 looked at before and something you're familiar with 11 this type of a plan in general. 12 I am not talking about this specific 13 plan, right now, but just generally, have you worked 14 with this type of a project? 15 A. Yes, with -- I've worked with this type 16 of project where we're -- again, we're replacing 17 older existing equipment with newer, more modern 18 equipment that will provide a higher degree of 19 reliability for everyone. 20 Q. Okay. And in your review of these 21 plans, did you note anything with respect to the 22 design of it and in particular, what are the issues 23 you had mentioned in your -- in your preamble, which 24 is the protection or minimization of the elimination 25 of existing trees; did you come up with anything on

File revisions (1)