Supporting Documentation · Jan 16, 2025
12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size
9bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0Indexed text · page 123
Show all pagesPage 123 1 further away from all the trees on the east side of 2 the site and the south side of the site, which we've 3 also heard testimony that these are some of the 4 larger trees that are being slated to be removed. 5 And again, I don't know the condition 6 of the trees, but this would possibly save some of 7 those trees if they are healthy trees. 8 You know another thing that, as I've 9 looked at this in the last several days, you know, 10 okay, what PSE&G is doing is they're coming out of 11 this transformer and running bus work out there 12 showing here to the switch gear. They also come out 13 this transformer with bus work down here 14 (indicating). 15 And then out of this transformer at the 16 top with bus work that comes all the way down in 17 here. And that -- 18 BY MR. TURTELTAUB: 19 Q. Now, you're using a term -- you're 20 using a term "bus work." 21 Can you just explain to the Board what 22 bus work is so everybody understands in the public as 23 well? 24 A. Okay. Bus work is just aluminum bus or 25 pipe bus that's installed on a type of structure.
File revisions (1)
- Sep 29, 2026
9bbf98ce9f61680,485 bytes