Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 16, 2025

12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size

Preserved file SHA-2569bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0

Indexed text · page 124

Show all pages
Page 124

Page 124 1 And what their bus work looks like is -- this is 2 their bus work running through here (indicating) that 3 they're proposing to install. And they've got 4 supports on a regular basis to maintain that bus work 5 so it doesn't sag and doesn't fall down. 6 Q. Okay. 7 A. Okay? 8 Q. Now, you -- you were along the right 9 side of the drawing there and I'm sorry to interrupt 10 you. 11 A. Okay. Okay. You all understand? You 12 follow? 13 And then they got bus work coming down 14 to here that comes into here (indicating). 15 The other thing that, I don't know if 16 they considered because it's not in the report that I 17 -- any of the reports that I have seen, is could this 18 switch gear be moved up into this area? 19 Because they have already got slated to 20 remove some trees up in here (indicating). 21 And again, that would preserve these 22 larger trees down in here (indicating), you know, in 23 the south and east side of the property if those are 24 healthy. 25 Not knowing the condition of the trees,

File revisions (1)