Page 125 1 not knowing what all PSE&G has looked at, I can't 2 tell you if that can be done, but I would hope that 3 that was something that had been considered by them. 4 Q. What are the impacts -- you know, 5 you're saying, well, we could move potentially the 6 new equipment that is on what I believe would be the 7 southeastern part of the property. You said they 8 could move it north. 9 What would be entailed in moving it 10 north and are there any restrictions either with 11 respect to the way they operate or physically that 12 they could not be moved, in your knowledge? 13 A. In my knowledge, again, if I -- if we 14 move this switch gear up here to this northerly side, 15 instead of running bus work from this transformer 16 down and this transformer down, we come from this 17 transformer here on the south side and go up to it 18 and this goes up and this goes over, it may be 19 shorter routes for their bus work to be installed, 20 which would then entail less cost to PSE&G. 21 Q. Now, in terms of moving it to that 22 location with other uses that may be there, does it 23 have any potential impact on that portion of the 24 property or the things near that as opposed to where 25 it is being planned for today?

File revisions (1)