Supporting Documentation · Jan 16, 2025
12 12 24 PSEG West Orange BOA ZB 24 06 PSEG 35 Mt Pleasant Ave Full Size
9bbf98ce9f6194c037e9c0b3ee303fc447eb8f04d22b926d170a53a4262b53e0Indexed text · page 126
Show all pagesPage 126 1 A. There is nothing that I have seen in 2 the report that has any details on what is up in that 3 area besides the trees, or if they have any future 4 use for that property. 5 So I have not seen anything to say what 6 that's going to be used for, or if it's just going to 7 remain as trees for the long term. 8 Q. With respect to the elevations of the 9 site in the northeastern part of the property where 10 you're looking at or even just moving it north, does 11 the elevation of where that equipment would be have 12 any impact on the ability to locate it there? 13 A. As long as we can obtain a flat site to 14 put the switch gear on, elevation doesn't matter. 15 And then the bus work, you know, the elevation of the 16 bus work is based upon how short or how tall the 17 supporting structures are. 18 Q. And the fact that there's equipment in 19 there today is the likelihood that that's already 20 graded to -- at this point in time to support such 21 equipment? 22 A. It should be a fairly flat site here 23 where this existing equipment will be removed. 24 Because, at the same time, you can just see the top 25 edge of the existing equipment for this south
File revisions (1)
- Sep 29, 2026
9bbf98ce9f61680,485 bytes